Cloud, network, servers and backup for your SME

We modernise, migrate or rebuild your IT environment. At the end, everything is fully documented.

When the server has been running for eight years

The backup is probably running too. Whether it can actually be restored is something nobody has checked in a long time.

Often a migration was only half finished: half Microsoft 365, half local storage. Nobody knows which version is the current one.

We get your infrastructure to a point where it is predictable, secure and easy to expand. What works well stays and becomes part of the new setup.

We document everything we build. So you do not depend on a single person, not even on us.

Typical projects

  • Migrating local servers to the cloud
  • Introducing or cleaning up Microsoft 365
  • Renewing the network and firewall, rebuilding Wi-Fi
  • Backup plan including a restore test
  • Standardised workstations and device management
  • Securely connecting a second location or home office

What we plan and build

We take you from planning to a documented handover. If you wish, we keep running the environment afterwards.

Cloud & migration

We introduce, clean up or migrate Microsoft 365 and Azure. Data transfer, permissions and training for your staff are part of it.

Network, servers, workstations

Firewall, switching, Wi-Fi, servers and standardised workstations. We size everything for your company.

Backup & resilience

We test the restore before we consider a backup finished. Our plans also cover retention.

IT security

Endpoint protection, multi-factor sign-in, permissions and hardening. We build security into the architecture from the start.

What a cleanly built environment changes

Fewer outages
Such an environment fails less often. And it is back up faster if something does happen.
Ready for growth
New staff, a second location or more data can be added without rebuilding anything.
Traceable
The environment is documented, and licences and decisions are traceable.

From assessment to handover

  1. Assessment

    We record the current state, requirements and dependencies. That includes the question of what must not stop under any circumstances.

  2. Plan & quote

    You receive the target architecture, migration path, schedule and costs in writing, before anyone touches anything.

  3. Implementation

    We migrate in stages and test in advance. Critical steps happen outside working hours, with a fallback.

  4. Handover

    You receive the documentation, and your team gets an introduction to the new environment.

After go-live, we stay on

Whoever built the environment also knows it when an incident occurs. That is why every project can move straight into our service desk, if you wish.

Questions before a project

Do we have to replace everything at once?

No. We work in stages and prioritise by risk and benefit. What works well stays.

Does our data stay in Switzerland?

Where the solution allows it, we rely on Swiss data centres. With international providers, we disclose where the data is stored and what that means for you.

How much of our operation stops during the migration?

We schedule critical steps for off-peak hours or the weekend. Every step has a fallback, so work can continue on Monday.

Do you work with our existing partner?

Yes. If parts of your IT stay with another provider, we coordinate the interfaces with them. That keeps responsibilities clear.

Let's talk about your infrastructure.

We look at the current state and tell you honestly what is needed and what is not.